You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 505693 items with Total of 506208 results

Advertising



Projects

Pinnacle Point WWTW
162
  • 28578
Expansion to the existing Pinnacle Point waste water treatment works in Pinnacle Point, Mossel Bay, Western Cape. R86 881 095.60. The scope of works includes the construction of new inlet works, MLE reactor, 24m diameter secondary settling tank with rotating bridge, SST’s division box with sluice gates,


Projects

N10 Section 5 Leuwekop to Luipertskop
116
  • 27408
Periodic maintenance on the National Route 10 Section 5 from Leuwekop at km 20.00 to Luipertskop at km 40.00 in the Northern Cape. R69 873 408.03. The GPS co-ordinates have been placed along the proposed construction area on the N10 31°15'28.9"S 24°45'09.7"E


Projects

Sebokeng TVET College Campus, Classrooms
141
  • 29820
Construction of classrooms at the existing Sebokeng TVET College Campus on 4 Samuel Street, Sebokeng, Gauteng. CIDB 7GB. The exact GPS Coordinates are 26°36'31.5"S 27°50'23.3"E


Projects

Sebokeng TVET College Campus, Cafeteria
145
  • 29823
Construction of a cafeteria at the existing Sebokeng TVET College Campus, on 4 Samuel Street, Sebokeng, Gauteng. CIDB 7GB. The exact GPS Coordinates are -26°36'31.5"S & 27°50'23.3"E


Projects

R27 Section 7 & 8, N Cape / W Cape Border to Calvinia
94
  • 31772
Construction and maintenance on National Route R27 Section 7 and 8 from the Northern Cape/Western Cape border at km 41.12 to Calvinia at km 69.82 in the Local Municipality of Hantam Municipality, District Municipality of Namakwa in the Northern Cape. Estimated Value: R310 914 000,00. The exact GPS location


Projects

EUCLID Lab Upgrades
1
  • 33180
Renovations at the EUCLID Mechanical and industrial Laboratories at the UNISA Florida Campus, 28 Pioneer Avenue, Florida Park, Roodepoort, Gauteng. CIDB 7GB. The scope of works is to extend the current mezzanine floor in both laboratories in order to cater for more enclosed labs as per the requirements


Projects

Bryntirion Estate - Gates & Dog Unit
227
  • 21736
Construction of gate 1 and 2 as well as the dog unit at the Bryntirion Estate, Pretoria, Gauteng. CIDB grading of 8GB.


Projects

Panfontein Sludge Pipelines
159
  • 27955
Earthworks, pipe laying, jacking and associated works for Panfontein sludge pipelines (Panfontein projects packages 3A and 3B) situated at two regions of Gauteng. CIDB 9CE Package 3A is the second phase of the sludge pipeline from Vereeniging Pump Station to the Vaal River Bridge Crossing at Maccauvlei.


Projects

Road P73/1 Eldorado Park to Ennerdale
340
  • 13699
Rehabilitation of Road P73/1 (R553) Eldorado Park to Ennerdale for a distance of 21.24km, in Johannesburg, Gauteng. The scope of works includes for road pavement assessments, rehabilitation design, contract documentation and site supervision. CIDB 9: R 200 Million Plus. The exact co-ordinates are currently


Projects

Randjesfontein Water Tower
158
  • 23003
Construction of a new 25m tall, 2.25ML water tower with pipework situated in Midrand, Johannesburg, Gauteng. The exact co-ordinates are currently not available however the approximate area of location is Randjesfontein, Lat -25.9401664, Long 28.1649291

Advertising

Send me a Sample Based on these search results