Refurbishment of the warehouse building at 6 Toulon Road, Bayhead, Durban, Kwazulu-Natal. CIDB 7GB. This refurbishment project is initiated to accommodate the TNPA’s clothing store which is currently located at an area earmarked for the Automotive Terminal expansion. The GPS location is -29.8927886,
Construction of classrooms at the existing Sebokeng TVET College Campus on 4 Samuel Street, Sebokeng, Gauteng. CIDB 7GB. The exact GPS Coordinates are 26°36'31.5"S 27°50'23.3"E
Upgrading and extension of Road P216/1 from Secunda to Embalenhle for a distance of 9.67km in the Gert Sibande District of the Mpumalanga Province. CIDB 9CE. The GPS coordinates are 26°31'03.7"S 29°09'59.3"E
The Grand Anse Dam and Water Transfer Project in Seychelles. Several schemes have been proposed for this project, including upper and lower dams, with the capability of hydro-electricity generation, and associated infrastructure such as access roads and pipelines, and a 1.9 KM tunnel linking the upper
Refurbishment, alterations and additions at Corridor 10 along the Grasmere and Lawley Train Stations located in Ennerdale, Johannesburg,Gauteng. CIDB 7GB/CE . The approximate GPS location has been placed along the proposed area of construction 26°25'28.2"S 27°51'46.4"E.
Refurbishment, alterations and additions along Corridor 10 at the Stretford and Residensia Train Stations located in Sebokeng, Johannesburg, Gauteng. CIDB 7GB. The approximate GPS location has been placed along the proposed area of construction 26°31'54.1"S 27°53'13.9"E.
Rehabilitation of Road P73/1 (R553) Eldorado Park to Ennerdale for a distance of 21.24km, in Johannesburg, Gauteng. The scope of works includes for road pavement assessments, rehabilitation design, contract documentation and site supervision. CIDB 9: R 200 Million Plus. The exact co-ordinates are currently
Upgrade and additions to the Uitenhage Provincial Hospital in Nelson Mandela Bay Metropolitan Municipality, Eastern Cape. CIDB 8GB. Scope of works: 72-hour assessment area, casualty & OPD, archiving, roof replacement and remedial works and basement stores waterproofing. GPS: -33.742119660794486, 25.4061536183083
Expansion to the existing Pinnacle Point waste water treatment works in Pinnacle Point, Mossel Bay, Western Cape. R86 881 095.60. The scope of works includes the construction of new inlet works, MLE reactor, 24m diameter secondary settling tank with rotating bridge, SST’s division box with sluice gates,
Construction of the bulk sewer pump station which includes the rising main and gravity lines in Laingville, St Helena Bay in the Western Cape. R40 224 684.63. The approximate GPS location has been placed in the proposed area of construction 32°47'12.6"S 18°04'06.9"E