Construction and completion of 27 apartments consisting of four residential blocks three storeys high above a communal basement on portion 1 of erf 11, Wierda Valley, in Pretoria Street, Sandton, Gauteng. The approximate construction area is 9 688m² and will include three 4-bedroom, fifteen 3-bedroom
Construction of classrooms at the existing Sebokeng TVET College Campus on 4 Samuel Street, Sebokeng, Gauteng. CIDB 7GB. The exact GPS Coordinates are 26°36'31.5"S 27°50'23.3"E
Upgrading and extension of Road P216/1 from Secunda to Embalenhle for a distance of 9.67km in the Gert Sibande District of the Mpumalanga Province. CIDB 9CE. The GPS coordinates are 26°31'03.7"S 29°09'59.3"E
The Grand Anse Dam and Water Transfer Project in Seychelles. Several schemes have been proposed for this project, including upper and lower dams, with the capability of hydro-electricity generation, and associated infrastructure such as access roads and pipelines, and a 1.9 KM tunnel linking the upper
Rehabilitation of Road P73/1 (R553) Eldorado Park to Ennerdale for a distance of 21.24km, in Johannesburg, Gauteng. The scope of works includes for road pavement assessments, rehabilitation design, contract documentation and site supervision. CIDB 9: R 200 Million Plus. The exact co-ordinates are currently
Construction of a new residential development consisting of a total of 184 duplex units to be know as Waterfall Manor at 80 Alsatian Road, Glen Austin, Extension 1685, Midrand, Gauteng. The development will be done over 3 phases. Features include a clubhouse with pool, half size basketball court, half
Expansion to the existing Pinnacle Point waste water treatment works in Pinnacle Point, Mossel Bay, Western Cape. R86 881 095.60. The scope of works includes the construction of new inlet works, MLE reactor, 24m diameter secondary settling tank with rotating bridge, SST’s division box with sluice gates,
Construction of the bulk sewer pump station which includes the rising main and gravity lines in Laingville, St Helena Bay in the Western Cape. R40 224 684.63. The approximate GPS location has been placed in the proposed area of construction 32°47'12.6"S 18°04'06.9"E
Construction and maintenance on National Route R27 Section 7 and 8 from the Northern Cape/Western Cape border at km 41.12 to Calvinia at km 69.82 in the Local Municipality of Hantam Municipality, District Municipality of Namakwa in the Northern Cape. Estimated Value: R310 914 000,00. The exact GPS location
Periodic maintenance and resurfacing on National Route R27 Section 10 from Brandvlei at km 0.00 to Kenhardt at km 141.96 in the District Municipality of ZF Mgcawu, Northern Cape. The exact GPS location is not known and the Marker has been placed on the R27 between the proposed areas of construction,