Construction of a trunk sewer from Ntshongweni to Dassenhoek Wastewater Treatment Works in Durban, KwaZulu-Natal. The exact GPS location is not known and the Marker has been placed at the site inspection venue: 29°51'09.4"S 31°01'29.4"E
Upgrades and rehabilitation to the KwaNdengezi wastewater treatment works and upstream catchment network in Ward 12, Durban, KwaZulu-Natal. CIDB 7CE. The GPS coordinates are 29°52'4.61"S, 30°46'3.08" E
*Note: Details Changed. Please see Closing Date.* Tenders are invited for the Dredging and dewatering of maturation pond sludge at various Wastewater Treatment Works on an as and when required basis, over a 36 month period.
Tenders are invited for Supply, Install, Commission 15mm And 25mm Plastic Smart Water Meters As And When Required For A Period Of 36 Months To Ethekwini Municipality
Rehabilitation of Umbilo Wastewater treatment works and upstream catchment network in ward 18, Umbilo, KwaZulu-Natal. CIDB 9CE. GPS of WWTW 29°50'42.7"S 30°53'27.3"E
Construction of the Western Waste Management Facility near Shongweni, Pinetown, KwaZulu-Natal. Value: R102 300 000.00. The scope of works comprises the re-alignment of 800m of MR461 and a new intersection on MR461 to serve as access to the facility; 1.8km of fencing including 3 gates; 1.1km of primary
Construction and remediation of Umhlanga wastewater treatment works in Hawaan, Blackburn, Umhlanga, Durban, Kwazulu-Natal. CIDB 7CE. The GPS location is 29°41’49.92’’S 31°4’53.95’’E
Construction of 96 new units at Kranskloof Community Residential Units (CRU) within eThekwini Municipality, KwaZulu-Natal. GPS co-ordinates: 29°44'26.65"S 30°59'53.10"E and 29°44'44.03"S 30°59'35.99"E. CIDB 8GB
Construction of the inlet pipeline to Adams Mission reservoir K6 in Ward 96 in the Adams Mission area, Ethekwini Metropolitan Municipality, KwaZulu-Natal. Value: R31 780 201.87. The GPS coordinates are: 29°59'45.6"S 30°46'27.3"E