Construction of the engine room 3 building, pipelines and associated structures at the Mapleton Pumping Station, Boksburg, Gauteng. CIDB grading required is 9CE/8CE PE
Richards Bay Minerals is proposing to mine heavy minerals from its approved Zulti South Mining Lease Area located along a 20km stretch of the KwaZulu-Natal coastline, south of Richards Bay and north of Port Durnford in KwaZulu-Natal. GPS coordinates lat: -28.9208692; long: 31.8820878.
Construction of the Western Waste Management Facility near Shongweni, Pinetown, KwaZulu-Natal. Value: R102 300 000.00. The scope of works comprises the re-alignment of 800m of MR461 and a new intersection on MR461 to serve as access to the facility; 1.8km of fencing including 3 gates; 1.1km of primary
Upgrading of the Nkanyezini Community Water Supply Scheme in Kwazulu-Natal. The scope of works includes the construction of a 10Ml reinforced concrete reservoir, 1 no 100Kl and 40Kl elevated tanks, 10 no. of 20Kl reinforced break pressure tank, 5 no. of 8Kl reinforced break pressure tanks, and 23 no.
Construction of earthworks, layerworks, surfacing, structures and road side furniture on Main Road P 700 Phase 2 from km 80,0 to km 84,5 between Empangeni and Ulundi in KwaZulu-Natal. Estimated project value: R98 700 000.00. The exact co-ordinates are currently not available however the approximate area
Construction of civils and services for the new Klipspruit Extension 7 development located in Kliptown, Soweto, Gauteng. The scope of works includes infrastructure for 1631 RDP houses and associated works such as water, sewer and roads. CIDB Grading 8 GB or higher and 8 CE or higher. The exact co-ordinates
The refurbishment of Mdantsane Sewer Treatment Works situated in Mdantsane, East London, Eastern Cape. CIDB 8 CE. The exact GPS co-ordinates are 32°56'45.9"S 27°43'29.7"E.
The Boikarabelo coal project is located in the Waterberg area of the Limpopo Province. Boikarabelo has probable reserves of 744.8 million tonnes of coal - an increase of 108.8 million tonnes, making it one of the largest remaining coal deposits in the country. The Boikarabelo coal seam is between 20
Greater Mpofana Bulk Water Supply Scheme: Construction of a 13.2 km long DN 650 rising main from Rosetta Water Treatment Works to Command Reservoir at Bruntville, in KwaZulu-Natal. Original project value: R98 million / Completion contract: CIDB 7. The exact coordinates are currently not available however