You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 6 items linked to T Maurukira

Advertising



Projects

Mkwasine Dam, Zimbabwe
75
  • 25505
Construction of the Mkwasine Dam in Masvingo province in Zimbabwe. The project entails the construction of a dam with a capacity of 105 million cubic metres, development of an irrigation scheme and construction of a mini-hydro power generation plant. Estimated project cost: US$ 70.75 million. The exact


Projects

Runde Tende Dam, Zimbabwe
127
  • 25453
Construction of the Runde Tende dam in Masvingo province, Zimbabwe. The dam is about 90m high. It will have a total volume of rock fill of about 2 000 000m² and a central core volume of about 520 000m². The water storage capacity will be about 1 billion m². Estimated Project cost: US$ 200 million. The


Projects

Mirror Dam, Zimbabwe
80
  • 25450
Construction of the Mirror dam in Chipenge, Zimbabwe. Technical details: full supply capacity: 22.87 x 106m³; 10% yield : 14 x 106m³; spillway capacity: 1,031 m³/s' maximum dam height: 36.5m and maximum water depth: 31m. Estimated project cost: US$ 43 million. The exact co-ordinates are currently not


Projects

Aberfoyle Dam, Zimbabwe
74
  • 25451
Construction of the Aberfoyle dam in Midlands, Zimbabwe. The total earthworks volume is estimated at 900 000m³. The project also includes putting in place 30 000m³ of concrete, while the water storage capacity will be 25m. Estimated project cost: US$ 70 million. The exact co-ordinates are currently not


Projects

Eastbourne Dam, Zimbabwe
78
  • 25449
Construction of the Eastbourne dam in Mutare, Zimbabwe. Technical details: maximum dam height: 36.5m; maximum water depth: 31m; live storage: 18.26 x 106m³ and 10% yield: 15 x 106m³ /ann. Estimated total project cost: US$ 39 million. The exact co-ordinates are currently not available however the approximate


Projects

Chitse Dam, Zimbabwe
77
  • 25452
Construction of the Chitse dam in Mount Darwin, Zimbabwe. Technical details: full supply capacity: 273 x 106m³; 10% yield: 136.5 x 106m³; maximum dam height: 48.3m; crest length: 1 250.0m and volume of material: 5 850 000.0m³. Estimated project cost: US$ 160 million. The exact co-ordinates are currently

Advertising

Send me a Sample Based on these search results