As part of the efforts towards improving the wellbeing of the people of the State especially in the area of provision of good road infrastructure, the Kwara State Government wishes to embark on the Construction of the above named road in order to open up the axis for meaningful socio- economic activities.
Execution of works for Mmamashia - Kanye North - South Carrier (NSC) Connection to Kanye in Botswana. The Department of Water Affairs intends to construct a conveyance pipeline from Mmamashia Waterworks to Kanye, together with the associated electromechanical infrastructure. Estimated project value P800
China Railways is proposing the construction of a $2.5bn rail link between Mozambique, Zambia, Malawi and Zimbabwe. The first phase of the project would consist of a 400km link between Shamva, a town about 100km northeast of Harare, and would head northeast to Moatize in Mozambique. From there, a 900km
IFB Number: MWT-DRIM/2024/01. TIIP Phase Il: Section 1 Upgrading of Railway Line Between Kranzberg and Otjiwarongo: The Ministry of Works and Transport through the Ministry of Finance has received financing from the African Development Bank hereinafter called the Bank toward the cost of the Upgrade of
Construction of the Trans-Zambezi railway extension: Grootfontein – Rundu – Katima Mulilo railway in Namibia. The exact co-ordinates are currently not available however the approximate area of location is lat: -17.5061578; long: 24.2806558
Construction of the Uganda Standard Gauge Railway in Uganda. The 271km railway is to link Kampala with the Kenyan border, Rwanda, Democratic Republic of the Congo and South Sudan. The project value is estimated to be US$2.3 billion.
Department of Road Infrastructure Development and Maintenance (RIDM) under the Ministry of Transport and Public Works has the mandate to provide safe, secure, and accessible road infrastructure. The Department achieves these through two main objectives, being; increasing accessibility of road infrastructure
Block paving of 13.1 km of the Tututme Goshwe road in Botswana. The contract shall consist of: Paving of existing gravel road with interlocking bricks. Re-designing of sharp curves. Installation of kerb stones and edge flashes. Construction and refurbishment of culverts and drifts along the road. Road
Upgrading of Tshesebe Mosojane Masunga road and access roads to bituminous standards in Botswana. The works contract is for the construction of 22.50 km of 2 lane carriage way Tshesebe Mosojane Masunga road and 28.70 km of access roads, including associated bridge works, cross drainage works, storm water
The project proposes to construct a 1 500-km-long rail line, which will connect Botswana’s Mmamabula coalfield to the Port of Walvis Bay, in Namibia, with a possible connection to South Africa’s Waterberg coalfield. The TKR project is expected to provide an alternative coal transport route to the Port