Construction of the 22ML Woodmead reservoir situated off Woodmead Drive, Woodmead, Sandton, Gauteng. R51 261 822.09 excluding vat. The GPS Co-Ordinates are Lat -26.0553657, Long 28.0897266
Construction of the engine room 3 building, pipelines and associated structures at the Mapleton Pumping Station, Boksburg, Gauteng. CIDB grading required is 9CE/8CE PE
Construction of a 20Ml reservoir, 11km bulk water line and 10km bulk sewer line in Winterveld Extension 3 & 4, Soshanguve, Pretoria, Gauteng. CIDB 9CE. GPS coordinates of the exact site are currently unavailable at this time. The GPS marker has temporarily been placed at the Boikhutsong Community Health
Construction of encasements to the BG1 and BG2 pipelines between Vaal Dam and Zoekfontein Control Works located in Gauteng. Scope of works includes the construction of encasement as well as a new flow meter chamber to the BG1 and BG2 and appurtenant works. CIDB 8CE / 7CE
Rehabilitation of Palmiet Pump Station situated in Van Bergen Street, Alberton, Gauteng. The contract value is R817 457 618,99. The scope of work will include but is not limited to work associated with the previously constructed 40.571km section of the existing B17 pipeline starting at Zuikerbosch Pump
Maintenance and servicing of buildings, civil, electrical and mechanical infrastructure and installation at the Lebombo Port of Entry in Mpumalanga. Value of contract R65 767 661.65 Approximate GPS co-ordinates as per Google: -25.4409938, 31.9153514.
Upgrade of Bergville raw water treatment works, replacement of AC rising the main pipeline to UPVC, rehabilitation of access road, stuff compound, and pump station in Bergville, KwaZulu-Natal. Contract Value: Withheld. Estimated GPS: -28.736589, 29.349836.
Upgrading of National Road R33 Section 13 in Vaalwater Town from km 60.8 to km 63.0, in the province of Limpopo. Estimated value of R263 180 336,95. The GPS location has been placed along the proposed area of construction at 24°17'09.0"S 28°06'06.8"E
Construction of the Babanana Water Project RS 135, Phase 1A in Nkambako, Limpopo. contract value is R88 million. A new pipeline is required in order to urgently replace the existing dilapidated pipeline as well as the installation of a gravity (return) pipeline from the Musiphana reservoirs to the three
Upgrading of National Road R573 Section 2, Work Package D from km 8.60 to km 13.00, Thembisile Hani Local Municipality, Nkangala District Municipality, Mpumalanga. CIDB 9CE. The GPS marker has been placed along the route of construction 25°24'07.0"S 28°42'16.5"E