Upgrading of the Sebokeng Waste Water Treatment Works in Gauteng : Module 6 and Module 7. The Sebokeng WWTW is situated approximately 18 km north-west of Vereeniging. The Works is bordered by the N1 to the west, R28 to the north, R553 to the east and R54 to the south, at approximately 26°34'29.03"S and
Construction of a 65 000m² 500-bed hospital (Doctor Pixley Ka Isaka Seme Memorial hospital ) in Bhejani Road, near KwaMashu area in Bridge City, in Ethekwini District, KwaZulu-Natal. Estimated project value: R3 billion. EDIT: Construction has continued during lockdown and this hospital is being prepared
Construction of a 20Ml/d Rosetta Water Treatment Plant and ancillary work, for the Greater Mpofana Bulk Water Supply Scheme, in KwaZulu-Natal. Estimated project value: R280 million.
The management measures of acid mine drainage in the Western, Central and Eastern Basin of the Witwatersrand Goldfields in Gauteng. Trans-Caledon Tunnel Authority has received a directive to upgrade existing plants and construct water treatment plants which will neutralise AMD within the Western, Central
Improvement of National Route 7 sections 1 and 2 between Abbotsdale (km 48.6 and 52.27) and Voortrekker Road Interchange (km 3.9), in the Western Cape.
Construction of a new Further Education and Training (FET) College Mthashana Campus: Bhambanana in the Jozini Local Municipality, KwaZulu-Natal Province.
Replacement of approximately 93 km of old asbestos cement water reticulation pipes, with unplasticized polyvinyl chloride (uPVC) and high density polyethylene (HDPE) pipes ranging in size from 50mm to 355mm diameter pipelines. The scope of works include: Replacement of valves, communication pipes and
Construction of Phase 2 of the Umshwathi Regional Bulk Water Supply Project. Phase 2 will consist of the construction of 16km of 700mm diameter steel pipeline with associated chambers, a 10ml concrete pre-stressed reservoir and a pump station, in KwaZulu-Natal. Estimated project value: R217 million (Inc.