The Cacata Project is located on the eastern boundary of the Cabinda exploration permit in Angola. The project is located close to infrastructure and ports, notably 5 kilometres from a highway (upgraded roads) and 50 kilometres from the ocean. The project has a JORC Indicated Resource of 30.4 million
Development of the proposed Leeuwkop Platinum Mine. The development will consist of a 1 350-m twin-shaft system to gain access to the orebody, as well as finalising the detailed mine design for Leeuwkop, which is situated in the western bushveld, near Brits in the North West Province. The pre-feasibility
The Reptile project is an exploratory development of uranium deposits in the Erongo Region of western of Namibia run by Deep Yellow Limited. It includes prospecting areas known as Tubas-Tumas and Tubas red sand. The deposit could be mined as a shallow, low-cost, free-dig truck-and-shovel operation. The
The Molo deposit is located in the Green Giant Graphite project in southern Madagascar, and is part of the joint venture (JV) property with Malagasy Minerals Limited in Madagascar. The proposed development includes the construction of an openpit mine, a processing plant and all supporting infrastructure,
Replacement of the Gloria Manganese Mine’s underground rock handling infrastructure and surface plant in the Northern Cape. R2.7-billion has been approved for the modernisation and optimisation of Assmang’s Gloria Manganese Mine at Black Rock in the Northern Cape. The exact co-ordinates are currently
The Styldrift Merensky, Phase 1, Project entails a twin vertical shaft system: the main shaft, reaching a depth of 740 m, and the services shaft, reaching 705 m. Full production of Phase 1 is expected to be achieved by 2017, which will increase the Bafokeng Rasimone platinum mine’s production to 430
CoAL of Africa Limited plans to build a five-million-tons-a-year opencast mine at its Vele coking coal project in the Limpopo Province. the has an estimated resource of 441-million tons, of which more than a 133-million tons are in the measured category. The estimated life-of-mine stretches beyond 2040.
The project is located about 38km east of the capital of Zimbabwe, Harare. The results of the pre-feasibility study on the Arcadia project has been confirmed and validated. Propspect's objective is to develop the project into a significant producer of high-quality spodumene, petalite and tantalite concentrates
Construction of the new 3 level Fuchs warehouse and head office to be situated on Erf No 484, 181, 468 & 18410, on 8 Diesel Road, Isando, Kempton Park, Johannesburg, Gauteng. GPS Co Ordinates Lat -26.14788, Long 28.20475. Value R107 536 000.00