The proposed development will consist of the 100 MW run-of-river Lower Orange Hydroelectrical Power Scheme (LOHEPS). The scheme will entail the development of up to nine small hydroelectric power stations, ranging from 6 MW to 12 MW, along the Lower Orange river, which has an estimated power generation
Construction of about 300 km of access roads to reach the hydroelectric plants will have to be built, as part of this proposed scheme. This proposed development will consist of the 100 MW run-of-river Lower Orange Hydroelectrical Power Scheme (LOHEPS). The scheme will entail the development of up to
Expressions of Interest are invited for Pre-Qualification for the provision of Consultancy Services, Geotechnical Survey and Auditing Services for the Lower Orange Hydro Electrical Power (LOHEPS) Scheme. NamPower (the national electricity utility of the Republic of Namibia), is planning the possible
Tenders are invited for the supply and delivery of wooden transmission poles. Description: 700 x Pole, Creosoted 12m, 160/ 180mm diameter. Specifications: Wooden Transmission Poles; 12m; 160-180mm top diameter; H4 Hazard Class; Creosote retention = 115kg/ m3; Flat top cut; Nail plates and wire strapping
Tenders are invited for the for environment impact assessment studies for a new 132 kV transmission line from the New Onuno Substation in the Ohangwena Region to the Namibia - Angola Border at Lalao Nafidi (Oshikango).
NamPower invites competent and registered companies to submit offers for the Supply and delivery of 1 Air Compressor percussion drill mounted on a 6x6 truck to NamPower. Section: Section A; Quantity: 1; Type: Air compressor percussion drill rig mounted on a 6x6 Truck; Engine capacity of 6x6 truck: 400HP