Project Details Fleurhof Mixed Use - Infrastructure

Fleurhof Mixed Use - Infrastructure
  • Proudly Researched by: Lauren Davids
  • Last Updated on: 06 September 2019.
  • There are 146 Subscribers monitoring this project.
  • This project has been viewed 500 times
Status: Postponed
Value: Unknown At This Stage

Details

Construction of civils and services for the Fleurhof mixed use development to be located at Fleurhof Drive, Fleurhof, Jo ...End of the details preview. Please Log in or Subscribe for ALL the information.

Private Sector Classified as: Invited / Negotiated
Johannesburg Region Timing: 2019 Onwards

Category

Infrastructure

Industry

Healthcare, Retail, Office & Commercial

Project Notes

This Project was last updated on the 2019-09-06, please Log in or Subscribe Now to L2B to receive further updates as this Project evolves!

Awards

There are no award notes as yet for this Project, Log in or Subscribe Now for more further updates!

Professionals

Private Developer

We have details of the Private Developer associated with this Project, Log in or Subscribe Now to be in the know!

Architect

We have details of the Architect associated with this Project, Log in or Subscribe Now to be in the know!

Quantity Surveyor

We have details of the Quantity Surveyor associated with this Project, Log in or Subscribe Now to be in the know!

Civil Engineer

We have details of the Civil Engineer associated with this Project, Log in or Subscribe Now to be in the know!

Structural Engineer

We have details of the Structural Engineer associated with this Project, Log in or Subscribe Now to be in the know!

Electrical Engineer

We have details of the Electrical Engineer associated with this Project, Log in or Subscribe Now to be in the know!

Mechanical Engineer

We have details of the Mechanical Engineer associated with this Project, Log in or Subscribe Now to be in the know!

Your Notes

Add a New Note


Project Photos


Quick Search Tags


Your Project Tags


Recent Projects

Related Leads

Construction of 3 residential buildings for a social housing scheme located on Erf 3525 & 3526, Extension 14, corner of Eskia Mphahlele Street and Johannes Ramokhoase Streets, Marabastad, west of Pretoria, Gauteng. The scope of works includes the construction of a 4, 7 and 8 level building to comprise of 509 apartment units in total. As well as bulk services, foundations, the superstructure, installation of aluminium windows and the relevant glazing, installation of finishes throughout the building including floor finishes, wall finishes and ceilings. Installation of fittings throughout the building, including sanitary fittings and kitchen units. Electrical installation including new transformer and switchgear, CCTV and access control, lightning protection and satellite TV. Fire protection installation including building evacuation, storage tanks and pumps, hydrants and hose reels. Wet Services installation including hot water generation, heat pumps, all water supply, waste water and soil drainage installations. Mechanical installation consisting of lifts. Installation of roofs, tiled and flat roof with waterproofing. External works of new paving, fencing and landscaping. Provision of refuse areas, drying yards and wash lines. GPS coordinates of the centre of the site are as follows: Latitude 25°44'36.6"S, Longitude 28°10'30.5"E (-25.743512, 28.175134)

Construction of the Mphephu Shopping Centre in Siloam village in Nzhelele, located 56km from Louis Trichardt and 35km from Thohoyandou, the site is bordered by the townships of Dzanani, Tshikomboni and Dopeni on Portion 4 of 199 of Farm Siloam, on the R523 in Limpopo. The proposed centre will comprise of approximately 6 000m² anchored by Shoprite and including the likes of Cashbuild, Pepkor Group and various food outlets. It will also have a new taxi rank. GPS Coordinates: 22°54'02.1"S 30°11'20.1"E

Construction of Illovo Phase 2 & 3 on Remainder of Portion 5 of the Farm Lot 22 No. 3255 and Remainder of Portion 1 of the Farm Lot 23 No. 3253, situated at 61 Pearce Road, Illovo South, KwaZulu-Natal. The development will consist of multiple 2-storey blocks, totalling 160 units (80 units per phase). The roof type will be a combination of concrete slab and concretetile. Approximate GPS Coordinates: -30.049768, 30.869399.

Send me a Sample Based on these search results